Electric mesh welding machine
Machine parameters
Model | DP-DNW-2 | DP-DNW-3 | DP-DNW-4 |
Wire diameter | 0.65-1.2mm,0.8-2mm | 1.3-2.5mm/2.8mm | 1.5-3.2mm |
Line wire space | 1/2”,1”,2”
(12.5mm,25mm,50mm) |
1”,2”,3”,4”,5”,6”
25,50,75,100,125,150mm |
25-150mm
(adjustable) |
Cross wire space | 1/2”,1”,2”
(12.5mm,25mm,50mm) |
1/2”,1”,2”,3”,4”,5”,6”
12.5,25,50,75,100,125,150mm |
12.5-150mm
(adjustable) |
Mesh width | 3ft, 4ft, 5ft | 4ft, 5ft, 6ft, 7ft, 8ft | 4ft, 5ft, 6ft, 7ft, 8ft |
Main motor | 2.2kw, 4kw, 5kw | 4kw, 5.5kw, 7.5kw | 4kw, 5.5kw, 7.5kw |
Welding transformer | 60/80kva*3-5pcs | 85kva*4-8pcs | 150kva*4/5/6/7/8pcs |
Welding speed | Mesh width 3ft, 4ft, max.120-150 times/min
Mesh width 5ft, max.100-120 times/min Mesh width 6ft, 7ft, 8ft, max.60-80 times/min |
Machine video
Machine advantages
The main motor is Mengniu brand, Chinese best brand.
The machine adopts separate control technology, welding transformers working separately to reduce the capacity.
Schneider electric components, Delta brand (Taiwan) inverter.
The machine use sealed welding transformers with full copper inside, the slag hard to go in while welding.
Services and Notes
Country we sold to:
Peru, Brazil, Argentina, Colombia, Mexico, South Africa, Turkmenistan, Saudi Arabia, Malaysia, Thailand…and so on.
After-sell service including:
1.Full set installation video from A to Z,
2.Lay-out of the product line and Electric drawing.
3.Installation instruction and Manual.
24HOUR on line service for every question.
After-sell service including:
technician go aboard to installation
Cost:
1.Round trip air ticket 2. Visa cost
3.Salary 150USD/day 4.Eating and accommodation
How to maintain:
Lubricate regularly as indication
Checking electric cables connection every month.
Clean the welding situation every day!
FAQ and Product application
What are the accepted payment methods?
A: T/T or L/C is acceptable. 30% in advance, we start produce machine. After machine finished, we will send you testing vide or you could come to check machine. If satisfied with machine, arrange balance 70% payment. The we can loading machine to you.
How to transport different type of machine?
A: Normally 1 set of machine need 1x40GP container, decide by the machine type and auxiliary equipment you choose.
The delivery time of mesh welding machine?
A:45 days
How to replace worn parts?
A: We have free spare part box loading together with machine. If there is other parts needed, normally we have stock, will send to you in 3 days.
How long is the warranty period of the this machine?
A: 1 year after the machine arrive in your factory. If the main part broken because of quality, not manually mistake operation, we will send you replace part for free.
Finished-product
Finished-product